Emergency Bulkhead Repair

Astoria Energy

Project Overview

When Astoria Energy’s bulkhead was in danger of failing, they needed an immediate engineered solution.

Upon inspection, we realized the area that was at risk of failing was an integral part of much larger system. MVN immediately began developing and implementing an engineered solution to the problem.

We removed much of the load from the failing cells and installed an engineered solution that stabilized the area. MVN’s expertise allowed us to quickly devise a smart, lasting solution for Astoria Energy, one that kept their facility working and in compliance with various regulatory agency rules.

Role & Responsibility