Our skills at work

The projects we’ve completed reflect the breadth of our capabilities and the depth of our creativity, and our clients keep bringing us their most unique and complex challenges.

Sort By:

View Project

Glenwood Landing Bulkhead

National Grid

Water is essential to the operation of power plants, but it’s also corrosive to a facility’s infrastructure, especially where it meets a body of water. When National Grid faced a failing bulkhead at its Glenwood Landing facility, they awarded MVN with the job of setting it right without interrupting their around-the-clock operations. We installed 600 […]

View Project
View Project

Harlem River Gas Main Emergency Bulkhead Repair

Con Edison

Con Edison needed an emergency repair to a bulkhead that surrounded a 36-inch natural gas main, and they chose MVN to get the job done safely and with no disruption in service. The job was full of risks. The bulkhead was in an active Mass Transit Authority rail yard in Manhattan. And because Con Edison […]

View Project
View Project

Ravenswood Power Plant

Keyspan Energy

The scale of power generation is reflected in the size and cost of the equipment used for its operation. The safe transport and correct assembly of that equipment is essential to both a power plant’s operation and its cost effectiveness. KeySpan trusted MVN to assemble and transport over 880 tons of equipment via barge to […]

View Project
View All